Nighttime view of the complex. To the left; Ore processing site, construction materials processing, solid fuels processing, biofuel refinery. To the right; crude oil refinery.
View attachment 40274
View attachment 40275
Latest mega project, geothermal plant. 6 towers each containing 240 geothermal generator units, producing 6000 rf/t per tower on a good day, 36000 rf/t at maximum capacity. The entire 30 meter deep site will be flooded with water to keep the towers cool. Progress at 20%, still under construction due to the large amounts of resources needed.
View attachment 40276
View from the main view dome.
View attachment 40277
Monitoring and control room, still under construction.
View attachment 40278
View attachment 40279
View from observation tubular corridor.
View attachment 40280